Department of Telecommunications, Ministry of Communications has notified “Indian Telegraph (Amendment) Rules” in Gazette of India vide G.S.R. 1131(E) PART XI” on 5th September 2017 which prescribes for Mandatory Testing and Certification of Telecommunication Equipment. Any telegraph which is used or capable of being used with any telegraph established, maintained or worked under the licence granted by the Central Government in accordance with the provisions of section 4 of the Indian Telegraph Act, 1885 (hereinafter referred to as the said Act), shall have to undergo prior mandatory testing and certification in respect of parameters as determined by the telegraph authority from time to time.
Telecommunication Engineering Centre, New Delhi, under
Department of Telecommunications (DoT), which, inter alia, is the Telegraph Authority for the purpose of Testing and Certification. The detailed procedure for Mandatory Testing and Certification of Telecommunication Equipment (MTCTE) under these rules are notified separately. The testing is to be carried out by Indian Accredited labs and based upon their test reports, certificate shall be issued by TEC.
Surveillance of products under MTCTE is carried out by Licensed Service Area (LSA) field units of Department of Telecommunications
Mandatorry Product:
S.N. | Essential Requirement/ Product Name | Product Variant Name | MTCTE Phase | Mandatory date of certification of product under MTCTE |
---|---|---|---|---|
1. | 2- Wire Telephone Equipment | 2-Line Feature Phone | Phase-1 | 1st October, 2019 |
2. | 2- Wire Telephone Equipment | CLIP (Calling Line Identification Presentation) Phone | Phase-1 | 1st October, 2019 |
3. | 2- Wire Telephone Equipment | Coin Box Telephone | Phase-1 | 1st October, 2019 |
4. | 2- Wire Telephone Equipment | Coin Box Telephone – Table Top | Phase-1 | 1st October, 2019 |
Interface | ||||
5. | 2- Wire Telephone Equipment | Electronic Telephone Instrument | Phase-1 | 1st October, 2019 |
6. | 2- Wire Telephone Equipment | Executive Telephone Systems | Phase-1 | 1st October, 2019 |
7. | 2- Wire Telephone Equipment | Key Telephone Systems | Phase-1 | 1st October, 2019 |
8. | 2- Wire Telephone Equipment | Key Telephone Systems with | Phase-1 | 1st October, 2019 |
proprietary interface | ||||
9. | 2- Wire Telephone Equipment | NSD (National Subscriber Dialing) or ISD (International Subscriber Dialing) Payphone | Phase-1 | 1st October, 2019 |
10. | 2- Wire Telephone Equipment | Terminals for connecting to | Phase-1 | 1st October, 2019 |
PSTN (Public Switched Telephone Network) | ||||
11. | G3 Fax Machine | FAX machine with handset | Phase-1 | 1st October, 2019 |
12. | G3 Fax Machine | FAX machine without handset | Phase-1 | 1st October, 2019 |
13. | Modem | V.90 or V.92 or V.21 to V.34 | Phase-1 | 1st October, 2019 |
Modem | ||||
14. | Cordless Telephone | Cordless Telephone | Phase-1 | 1st October, 2019 |
15. | ISDN (Integrated Services Digital Network) Customer Premises | ISDN Gateway | Phase-1 | 1st October, 2019 |
Equipment | ||||
16. | ISDN (Integrated Services Digital Network) Customer Premises | ISDN NT-1 Network | Phase-1 | 1st October, 2019 |
Equipment | Termination | |||
17. | ISDN (Integrated Services Digital Network) Customer Premises | ISDN Terminal | Phase-1 | 1st October, 2019 |
Equipment | ||||
18. | ISDN (Integrated Services Digital Network) Customer Premises | ISDN Terminal Adapter | Phase-1 | 1st October, 2019 |
Equipment | ||||
19. | ISDN (Integrated Services Digital Network) Customer Premises | Multipoint Conferencing Server | Phase-1 | 1st October, 2019 |
Equipment | ||||
20. | ISDN (Integrated Services Digital Network) Customer Premises | PC card based ISDN Terminal | Phase-1 | 1st October, 2019 |
Equipment | ||||
21. | Private Automatic Branch | Private Automatic Branch | Phase-1 | 1st October, 2019 |
Exchange | Exchange | |||
22. | PON (Passive Optical Network) Family of Broadband | PON OLT (Optical Line Terminal) | Phase-2 | 1st October, 2020 |
Equipment | ||||
23. | PON (Passive Optical Network) Family of Broadband | PON ONT (Optical Network Terminal) | Phase-2 | 1st October, 2020 |
Equipment | ||||
24. | PON (Passive Optical Network) Family of Broadband | PON ONU (Optical Network Unit) | Phase-2 | 1st October, 2020 |
Equipment | ||||
25. | Feedback Device | Feedback Device | Phase-2 | 1st October, 2020 |
26. | Transmission Terminal | Multiplexing Equipment | Phase-2 | 1st October, 2020 |
Equipment-1 | ||||
27. | Transmission Terminal | SDH (Synchronous Digital Hierarchy) Equipment | Phase-2 | 1st October, 2020 |
Equipment-1 | ||||
28. | Equipments Operating in 2.4 | PTP PMP Wireless Access | Phase-3 | 1st January, 2024 |
GHz and 5 GHz Band | Equipment 2.4 or 5 GHz | |||
29. | Equipments Operating in 2.4 | Wifi Access Points and CPE (Customer Premises Equipment) | Phase-3 | 1st January, 2024 |
GHz and 5 GHz Band | ||||
30. | Equipments Operating in 2.4 | WLAN Controller Equipment | Phase-3 | 1st January, 2024 |
GHz and 5 GHz Band | ||||
31. | End Point Device for | End Point Device for | Phase-3 | 1st January, 2024 |
Environmental Monitoring | Environmental Monitoring | |||
32. | Repeater for Cellular Network | GSM and WCDMA Repeater | Phase-3 | 1st April, 2024 |
33. | Repeater for Cellular Network | GSM Repeater | Phase-3 | 1st April, 2024 |
34. | Repeater for Cellular Network | GSM WCDMA and LTE | Phase-3 | 1st April, 2024 |
Repeater | ||||
35. | Repeater for Cellular Network | LTE (Long Term Evolution) Repeater | Phase-3 | 1st April, 2024 |
36. | Repeater for Cellular Network | WCDMA (Wideband Code Division Multiple Access) and LTE Repeater | Phase-3 | 1st April, 2024 |
37. | Repeater for Cellular Network | WCDMA (Wideband Code Division Multiple Access) Repeater | Phase-3 | 1st April, 2024 |
38. | Base Station for Cellular | BTS (Base Transceiver Station ) for GSM (Global System for Mobile Communication) | Phase-3 | 1st August, 2024 |
Network | ||||
39. | Base Station for Cellular | BTS with AAS (Advanced Antenna Systems) | Phase-3 | 1st August, 2024 |
Network | ||||
40. | Base Station for Cellular | BTS with MSR (Multi-Standard Radio) up to 4G | Phase-3 | 1st August, 2024 |
Network | ||||
41. | Base Station for Cellular | eNodeB for LTE (Long Term Evolution) | Phase-3 | 1st August, 2024 |
Network | ||||
42. | Base Station for Cellular | NodeB for WCDMA | Phase-3 | 1st August, 2024 |
Network | ||||
43. | Compact Cellular Network | BTS CCN | Phase-3 | 1st January, 2024 |
44. | Compact Cellular Network | eNodeB CCN | Phase-3 | 1st January, 2024 |
45. | Compact Cellular Network | NodeB CCN | Phase-3 | 1st January, 2024 |
46. | IoT (Internet of Things) Gateway | IoT Gateway | Phase-3 | 1st January, 2024 |
47. | Tracking Device | Asset Tracking Device | Phase-3 | 1st January, 2024 |
48. | Tracking Device | Human Tracking Device | Phase-3 | 1st January, 2024 |
49. | Tracking Device | Pet Tracking Device | Phase-3 | 1st January, 2024 |
50. | Tracking Device | Standalone tracking device for Vehicle | Phase-3 | 1st January, 2024 |
51. | Smart Electricity Meter | Smart Electricity Meter | Phase-3 | 1st August, 2024 |
52. | Mobile Radio Trunking System | MRTS Base Station – Baseband | Phase-4 | 1st August, 2024 |
plus Radio | ||||
53. | Mobile Radio Trunking System | MRTS Base Station – Radio Only | Phase-4 | 1st August, 2024 |
54. | Mobile Radio Trunking System | MRTS Baseband Equipment | Phase-4 | 1st August, 2024 |
without Radio | ||||
55. | Mobile Radio Trunking System | MRTS Fixed Station | Phase-4 | 1st August, 2024 |
56. | Mobile Radio Trunking System | MRTS Handheld Portable | Phase-4 | 1st August, 2024 |
Station | ||||
57. | Mobile Radio Trunking System | MRTS Mobile Station | Phase-4 | 1st August, 2024 |
58. | Conferencing Equipment | Audio Conference Facility | Phase-4 | 1st January, 2024 |
Device | ||||
59. | Conferencing Equipment | Multi Line Telephone System | Phase-4 | 1st January, 2024 |
60. | HF (High Frequency) Radio | HF Base Station – Baseband plus | Phase-4 | 1st April, 2024 |
Radio | ||||
61. | HF (High Frequency) Radio | HF Base Station – Radio Only | Phase-4 | 1st April, 2024 |
62. | HF (High Frequency) Radio | HF Baseband Equipment without | Phase-4 | 1st April, 2024 |
Radio | ||||
63. | HF (High Frequency) Radio | HF Fixed Station | Phase-4 | 1st April, 2024 |
64. | HF (High Frequency) Radio | HF Handheld Portable Stations | Phase-4 | 1st April, 2024 |
65. | HF (High Frequency) Radio | HF Mobile Stations | Phase-4 | 1st April, 2024 |
66. | VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System | VHF UHF Base Station – | Phase-4 | 1st August, 2024 |
Equipment | Baseband plus Radio | |||
67. | VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System | VHF UHF Base Station – Radio | Phase-4 | 1st August, 2024 |
Equipment | Only | |||
68. | VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System | VHF UHF Baseband Equipment | Phase-4 | 1st August, 2024 |
Equipment | without Radio | |||
69. | VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System | VHF UHF Fixed Station | Phase-4 | 1st August, 2024 |
Equipment | ||||
70. | VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System | VHF UHF Handheld Portable | Phase-4 | 1st August, 2024 |
Equipment | Stations | |||
71. | VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System | VHF UHF Mobile Stations | Phase-4 | 1st August, 2024 |
Equipment | ||||
72. | PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed | PTP or PMP Full Outdoor | Phase-4 | 1st August, 2024 |
Radio Systems | Microwave Systems | |||
73. | PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed | PTP or PMP Split MW Indoor | Phase-4 | 1st August, 2024 |
Radio Systems | Unit | |||
74. | PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed | PTP or PMP Split MW Outdoor | Phase-4 | 1st August, 2024 |
Radio Systems | Unit | |||
75. | PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed | PTP/PMP Split M W System | Phase-4 | 1st August, 2024 |
Radio Systems | ||||
76. | Media Gateway | Line Media Gateway | Phase-4 | 1st January, 2024 |
77. | Media Gateway | Media Gateway | Phase-4 | 1st January, 2024 |
78. | Media Gateway | Media Gateway for CPE | Phase-4 | 1st January, 2024 |
79. | Signalling Gateway | Signalling Gateway | Phase-4 | 1st January, 2024 |
80. | Session Border Controller | Session Border Controller | Phase-4 | 1st January, 2024 |
81. | Softswitch | Softswitch | Phase-4 | 1st January, 2024 |
82. | DSL(Digital Subscriber Line) Equipments | DSLAM | Phase-4 | 1st January, 2024 |
83. | DSL(Digital Subscriber Line) Equipments | DSL Modem | Phase-4 | 1st January, 2024 |
84. | Satellite Communication | Satellite Amplifier | Phase-4 | 1st August, 2024 |
Equipment | ||||
85. | Satellite Communication | Satellite Baseband Mod or | Phase-4 | 1st August, 2024 |
Equipment | Demod or Controller | |||
86. | Satellite Communication | Satellite Baseband Modem | Phase-4 | 1st August, 2024 |
Equipment | ||||
87. | Satellite Communication | Satellite Baseband Modem | Phase-4 | 1st August, 2024 |
Equipment | Controller | |||
88. | Satellite Communication | Satellite BUC (Block Up Converter) | Phase-4 | 1st August, 2024 |
Equipment | ||||
89. | Satellite Communication | Satellite IF Transreceiver | Phase-4 | 1st August, 2024 |
Equipment | ||||
90. | Satellite Communication | Satellite LNA (Low Noise Amplifier) | Phase-4 | 1st August, 2024 |
Equipment | ||||
91. | Satellite Communication | Satellite LNB(Low Noise Block downconverter) | Phase-4 | 1st August, 2024 |
Equipment | ||||
92. | Satellite Communication | Satellite Optimisation Equipment | Phase-4 | 1st August, 2024 |
Equipment | ||||
93. | Satellite Communication | Satellite Radio Frequency | Phase-4 | 1st August, 2024 |
Equipment | Transceiver | |||
94. | Satellite Communication | VSAT (Very Small Aperture Terminal) Terminals | Phase-4 | 1st August, 2024 |
Equipment | ||||
95. | LAN (Local Area Network) Switch | L2 LAN Switch | Phase-4 | 1st August, 2024 |
96. | LAN (Local Area Network) Switch | L3 LAN Switch | Phase-4 | 1st August, 2024 |
97. | LAN (Local Area Network) Switch | MPLS (Multiprotocol Label Switching) TP (Transport Profile) CEN (Carrier Ethernet Network )Switch | Phase-4 | 1st August, 2024 |
98. | LAN (Local Area Network) Switch | L2 Unmanaged Switch | Phase-4 | 1st August, 2024 |
99. | Router | BNG (Broadband Network Gateway) or BRAS (Broadband Remote Access Server) Router | Phase-4 | 1st August, 2024 |
100. | Router | Cloud Control Capable Router | Phase-4 | 1st August, 2024 |
101. | Router | IPV4 (Internet Protocol v4) Router | Phase-4 | 1st August, 2024 |
102. | Router | IPV6 (Internet Protocol v6) Router | Phase-4 | 1st August, 2024 |
103. | Router | MPLS (Multiprotocol Label Switching) Router | Phase-4 | 1st August, 2024 |
104. | Transmission Terminal | DWDM (Dense wavelength-division multiplexing) Equipment | Phase-4 | 1st January, 2024 |
Equipment-2 | ||||
105. | Transmission Terminal | Digital Cross Connect | Phase-4 | 1st January, 2024 |
Equipment-2 | ||||
106. | IP (Internet Protocol) Security Equipment | Firewall Equipment | Phase-4 | 1st August, 2024 |
107. | IP (Internet Protocol) Security Equipment | Intrusion Detection System | Phase-4 | 1st August, 2024 |
Equipment | ||||
108. | IP (Internet Protocol) Security Equipment | Intrusion Prevention System | Phase-4 | 1st August, 2024 |
Equipment | ||||
109. | IP (Internet Protocol) Security Equipment | Unified Threat Management | Phase-4 | 1st August, 2024 |
Equipment | ||||
110. | Precision Timing Protocol | Precision Timing Protocol Grand | Phase-4 | 1st January, 2024 |
Grand Master Equipment | Master Equipment | |||
111. | Mobile Management Entity | MME with connectivity to MSC SGSN | Phase-4 | 1st January, 2024 |
112. | Mobile Management Entity | MME for LTE | Phase-4 | 1st January, 2024 |
113. | Cell Broadcast Centre | CBC for GSM | Phase-4 | 1st January, 2024 |
114. | Cell Broadcast Centre | CBC for LTE or LTE-A | Phase-4 | 1st January, 2024 |
115. | Cell Broadcast Centre | CBC For UMTS | Phase-4 | 1st January, 2024 |
116. | IP Multimedia Conferencing | IP Multimedia Conferencing | Phase-4 | 1st January, 2024 |
Equipment | Equipment | |||
117. | BSC (Base Station Control) RNC (Radio Network Controller) | BSC for GSM | Phase-4 | 1st January, 2024 |
118. | BSC (Base Station Control) RNC (Radio Network Controller) | RNC for WCDMA | Phase-4 | 1st January, 2024 |
119. | SMLC (Serving Mobile Location Center)or eSMLC (Evolved Serving Mobile Location Center ) | eSMLC for LTE | Phase-4 | 1st January, 2024 |
120. | SMLC (Serving Mobile Location Center)or eSMLC (Evolved Serving Mobile Location Center ) | SMLC for GSM | Phase-4 | 1st January, 2024 |
121. | SMLC (Serving Mobile Location Center)or eSMLC (Evolved Serving Mobile Location Center ) | SMLC for WCDMA | Phase-4 | 1st January, 2024 |
122. | SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) | GGSN | Phase-4 | 1st January, 2024 |
123. | SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) | SGSN For GSM | Phase-4 | 1st January, 2024 |
124. | SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) | SGSN For LTE | Phase-4 | 1st January, 2024 |
125. | SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) | SGSN For WCDMA | Phase-4 | 1st January, 2024 |
126. | HLR (Home Location Register) AUC (Authentication Cente) HSS (Home Subscriber Server) | HLR or AUC | Phase-4 | 1st January, 2024 |
127. | HLR (Home Location Register) AUC (Authentication Cente) HSS (Home Subscriber Server) | HSS | Phase-4 | 1st January, 2024 |
128. | MSC or MSC-S or GMSC or | MSC-S or GMSC-S | Phase-4 | 1st January, 2024 |
GMSC-S including VLR | ||||
129. | MSC or MSC-S or GMSC or | MSC or GMSC including VLR | Phase-4 | 1st January, 2024 |
GMSC-S including VLR | for GSM | |||
130. | MSC or MSC-S or GMSC or | MSC or GMSC including VLR | Phase-4 | 1st January, 2024 |
GMSC-S including VLR | for WCDMA | |||
131. | Infiniband Switch | Infiniband Switch | Phase-4 | 1st January, 2024 |
132. | OTA (Over-The-Air) and DM (Device Manager) or FOTA (Firmware Over-The-Air) | DM or FOTA | Phase-4 | 1st January, 2024 |
133. | OTA (Over-The-Air) and DM (Device Manager) or FOTA (Firmware Over-The-Air) | OTA | Phase-4 | 1st January, 2024 |
134. | SCP (Service Control Point) | SCP | Phase-4 | 1st January, 2024 |
135. | OMC(Operations and Maintenance Center) or EMS (Element Management Systems) or NMS (Network Management Systems) or OSS (Operations Support System) | NMS | Phase-4 | 1st January, 2024 |
136. | OMC(Operations and Maintenance Center) or EMS (Element Management Systems) or NMS (Network Management Systems) or OSS (Operations Support System) | OMC or EMS | Phase-4 | 1st January, 2024 |
137. | S-GW (Serving Gateway) or P-GW (Packet Data Network Gateway) | P-Gateway | Phase-4 | 1st January, 2024 |
138. | S-GW (Serving Gateway) or P-GW (Packet Data Network Gateway) | S-Gateway | Phase-4 | 1st January, 2024 |
139. | SMSC (Short Message Service Center) | SMSC | Phase-4 | 1st January, 2024 |
140. | GMLC (Gateway Mobile Location Centre) | GMLC for GSM or WCDMA | Phase-4 | 1st January, 2024 |
141. | GMLC (Gateway Mobile Location Centre) | GMLC for LTE or LTE-A | Phase-4 | 1st January, 2024 |
142. | EIR (Equipment Identity Register) | EIR for GSM or WCDMA | Phase-4 | 1st January, 2024 |
143. | EIR (Equipment Identity Register) | EIR for LTE | Phase-4 | 1st January, 2024 |
144. | Optical Fibre Cable | Hybrid Cable – Optical and | Phase-4 | 1st January, 2024 |
Metallic | ||||
145. | Optical Fibre Cable | Optical Fibre Cable – ADSS on | Phase-4 | 1st January, 2024 |
Aerial alignment | ||||
146. | Optical Fibre Cable | Optical Fibre Cable – ADSS along | Phase-4 | 1st January, 2024 |
Power line | ||||
147. | Optical Fibre Cable | Optical Fibre Cable – Direct | Phase-4 | 1st January, 2024 |
Buried | ||||
148. | Optical Fibre Cable | Optical Fibre Cable – DSA | Phase-4 | 1st January, 2024 |
149. | Optical Fibre Cable | Optical Fibre Cable – Duct | Phase-4 | 1st January, 2024 |
150. | Optical Fibre Cable | Optical Fibre Cable – In home | Phase-4 | 1st January, 2024 |
151. | Optical Fibre Cable | Optical Fibre Cable – Indoor | Phase-4 | 1st January, 2024 |
152. | Optical Fibre Cable | Optical Fibre Cable – Indoor/ | Phase-4 | 1st January, 2024 |
Outdoor | ||||
153. | Optical Fibre Cable | Optical Fibre Cable – Micro-Duct | Phase-4 | 1st January, 2024 |
154. | Optical Fibre Cable | Optical Fibre Cable – Access Outdoor | Phase-4 | 1st January, 2024 |
155. | Optical Fibre Cable | Optical Groung Wire -OPGW | Phase-4 | 1st January, 2024 |
156. | SIM (Subscriber Identity Module) | CSIM (CDMA SIM) | Phase-4 | 1st August, 2024 |
157. | SIM (Subscriber Identity Module) | eSIM (Embedded SIM) | Phase-4 | 1st August, 2024 |
158. | SIM (Subscriber Identity Module) | eUICC (Embedded Universal Integrated Circuit Card) | Phase-4 | 1st August, 2024 |
159. | SIM (Subscriber Identity Module) | RUIM (Removable User Identity Module) | Phase-4 | 1st August, 2024 |
160. | SIM (Subscriber Identity Module) | SIM | Phase-4 | 1st August, 2024 |
161. | SIM (Subscriber Identity Module) | UICC (Universal Integrated Circuit Card) based ISIM | Phase-4 | 1st August, 2024 |
162. | SIM (Subscriber Identity Module) | USIM (Universal Subscriber Identity Module) | Phase-4 | 1st August, 2024 |
163. | Radio Broadcast Receiver RBR | All Motor vehicle RBRs | Phase-4 | 1st January, 2024 |
requiring external power | ||||
164. | All RBRs driven with inbuilt | 1st January, 2024 | ||
Radio Broadcast Receiver RBR | power source | Phase-4 | ||
165. | Other devices having RBR interface | 1st January, 2024 | ||
Radio Broadcast Receiver RBR | Phase-4 | |||
166. | Optical Fibre – Single Mode | Optical Fibre – G.652.D | Phase-4 | 1st January, 2024 |
167. | Optical Fibre – Single Mode | Optical Fibre – G.655 | Phase-4 | 1st January, 2024 |
168. | Optical Fibre – Single Mode | Optical Fibre – G.656 | Phase-4 | 1st January, 2024 |
169. | Optical Fibre – Single Mode | Optical Fibre – G.657. A1 | Phase-4 | 1st January, 2024 |
170. | Optical Fibre – Single Mode | Optical Fibre – G.657. A2 | Phase-4 | 1st January, 2024 |
171. | Optical Fibre – Single Mode | Optical Fibre – G.657. B3 | Phase-4 | 1st January, 2024 |
172. | Optical Fibre – Single Mode | Optical Fibre -G.654.D | Phase-4 | 1st January, 2024 |
173. | Optical Fibre – Single Mode | Optical Fibre -G.654.E | Phase-4 | 1st January, 2024 |
174. | Base station for cellular network for 5G | BTS with Multi Standard Radio | Phase-5 | 1st July, 2024 |
175. | Base station for cellular network for 5G | Active Antenna System-OTA | Phase-5 | 1st July, 2024 |
176. | Base station for cellular network for 5G | Base Station 5G NR Type 1C | Phase-5 | 1st July, 2024 |
177. | Base station for cellular network for 5G | Base Station 5G NR Type 1H | Phase-5 | 1st July, 2024 |
178. | Base station for cellular network for 5G | Base Station 5G NR Type 1O | Phase-5 | 1st July, 2024 |
179. | Base station for cellular network for 5G | Base Station 5G NR Type 2O | Phase-5 | 1st July, 2024 |
180. | Base station for cellular network for 5G | Hybrid Active Antenna System | Phase-5 | 1st July, 2024 |
181. | 5G Core | AMF (Access and Mobility Management Function ) | Phase-5 | 1st July, 2024 |
182. | 5G Core | AuSF (The Authentication Server Function) | Phase-5 | 1st July, 2024 |
183. | 5G Core | BSF (Binding Support Function) | Phase-5 | 1st July, 2024 |
184. | 5G Core | CHF (Charging Function) | Phase-5 | 1st July, 2024 |
185. | 5G Core | NEF (Network Exposure Function) | Phase-5 | 1st July, 2024 |
186. | 5G Core | NSSF (Network Slice Selection Function) | Phase-5 | 1st July, 2024 |
187. | 5G Core | PCF (Policy Control Function) | Phase-5 | 1st July, 2024 |
188. | 5G Core | SMF (Session Management Function) | Phase-5 | 1st July, 2024 |
189. | 5G Core | SMSF (Short Message Service Function) | Phase-5 | 1st July, 2024 |
190. | 5G Core | UDM (Unified Data Management) | Phase-5 | 1st July, 2024 |
191. | 5G Core | UDR (Unified Data Repository) | Phase-5 | 1st July, 2024 |
192. | 5G Core | UPF (User Plane Function) | Phase-5 | 1st July, 2024 |
193. | Hypervisor | Hypervisor | Phase-5 | 1st July, 2024 |
194. | E-band Fixed Radio Relay System | E-Band MW Full Outdoor System | Phase-5 | 1st July, 2024 |
195. | E-band Fixed Radio Relay System | E-Band MW Outdoor System plus Indoor System | Phase-5 | 1st July, 2024 |
196. | Converged Multi service Application Access Equipment | C-MSAAE | Phase-5 | 1st July, 2024 |
(C-MSAAE) | ||||
197. | IP (Internet Protocol)Terminal | SIP Terminal | Phase-5 | 1st July, 2024 |