+91 8668546474 Mon-Sat : 10:00 - 19:00
Info@lockene.info

tec-certification

Department of Telecommunications, Ministry of Communications has notified “Indian Telegraph (Amendment) Rules” in Gazette of India vide G.S.R. 1131(E) PART XI” on 5th September 2017 which prescribes for Mandatory Testing and Certification of Telecommunication Equipment. Any telegraph which is used or capable of being used with any telegraph established, maintained or worked under the licence granted by the Central Government in accordance with the provisions of section 4 of the Indian Telegraph Act, 1885 (hereinafter referred to as the said Act), shall have to undergo prior mandatory testing and certification in respect of parameters as determined by the telegraph authority from time to time.

Telecommunication Engineering Centre, New Delhi, under

Department of Telecommunications (DoT), which, inter alia, is the Telegraph Authority for the purpose of Testing and Certification. The detailed procedure for Mandatory Testing and Certification of Telecommunication Equipment (MTCTE) under these rules are notified separately. The testing is to be carried out by Indian Accredited labs and based upon their test reports, certificate shall be issued by TEC.

Surveillance of products under MTCTE is carried out by Licensed Service Area (LSA) field units of Department of Telecommunications

Mandatorry Product:

 

S.N. Essential Requirement/ Product Name Product Variant Name MTCTE Phase Mandatory date of certification of product under MTCTE
1. 2- Wire Telephone Equipment 2-Line Feature Phone Phase-1 1st October, 2019
2. 2- Wire Telephone Equipment CLIP (Calling Line Identification Presentation) Phone Phase-1 1st October, 2019
3. 2- Wire Telephone Equipment Coin Box Telephone Phase-1 1st October, 2019
4. 2- Wire Telephone Equipment Coin Box Telephone – Table Top Phase-1 1st October, 2019
Interface
5. 2- Wire Telephone Equipment Electronic Telephone Instrument Phase-1 1st October, 2019
6. 2- Wire Telephone Equipment Executive Telephone Systems Phase-1 1st October, 2019
7. 2- Wire Telephone Equipment Key Telephone Systems Phase-1 1st October, 2019
8. 2- Wire Telephone Equipment Key Telephone Systems with Phase-1 1st October, 2019
proprietary interface
9. 2- Wire Telephone Equipment NSD (National Subscriber Dialing) or ISD (International Subscriber Dialing) Payphone Phase-1 1st October, 2019
10. 2- Wire Telephone Equipment Terminals for connecting to Phase-1 1st October, 2019
PSTN (Public Switched Telephone Network)
11. G3 Fax Machine FAX machine with handset Phase-1 1st October, 2019
12. G3 Fax Machine FAX machine without handset Phase-1 1st October, 2019
13. Modem V.90 or V.92 or V.21 to V.34 Phase-1 1st October, 2019
Modem
14. Cordless Telephone Cordless Telephone Phase-1 1st October, 2019
15. ISDN (Integrated Services Digital Network) Customer Premises ISDN Gateway Phase-1 1st October, 2019
Equipment
16. ISDN (Integrated Services Digital Network) Customer Premises ISDN NT-1 Network Phase-1 1st October, 2019
Equipment Termination
17. ISDN (Integrated Services Digital Network) Customer Premises ISDN Terminal Phase-1 1st October, 2019
Equipment
18. ISDN (Integrated Services Digital Network) Customer Premises ISDN Terminal Adapter Phase-1 1st October, 2019
Equipment
19. ISDN (Integrated Services Digital Network) Customer Premises Multipoint Conferencing Server Phase-1 1st October, 2019
Equipment
20. ISDN (Integrated Services Digital Network) Customer Premises PC card based ISDN Terminal Phase-1 1st October, 2019
Equipment
21. Private Automatic Branch Private Automatic Branch Phase-1 1st October, 2019
Exchange Exchange
22. PON (Passive Optical Network) Family of Broadband PON OLT (Optical Line Terminal) Phase-2 1st October, 2020
Equipment
23. PON (Passive Optical Network) Family of Broadband PON ONT (Optical Network Terminal) Phase-2 1st October, 2020
Equipment
24. PON (Passive Optical Network) Family of Broadband PON ONU (Optical Network Unit) Phase-2 1st October, 2020
Equipment
25. Feedback Device Feedback Device Phase-2 1st October, 2020
26. Transmission Terminal Multiplexing Equipment Phase-2 1st October, 2020
Equipment-1
27. Transmission Terminal SDH (Synchronous Digital Hierarchy) Equipment Phase-2 1st October, 2020
Equipment-1
28. Equipments Operating in 2.4 PTP PMP Wireless Access Phase-3 1st January, 2024
GHz and 5 GHz Band Equipment 2.4 or 5 GHz
29. Equipments Operating in 2.4 Wifi Access Points and CPE (Customer Premises Equipment) Phase-3 1st January, 2024
GHz and 5 GHz Band
30. Equipments Operating in 2.4 WLAN Controller Equipment Phase-3 1st January, 2024
GHz and 5 GHz Band
31. End Point Device for End Point Device for Phase-3 1st January, 2024
Environmental Monitoring Environmental Monitoring
32. Repeater for Cellular Network GSM and WCDMA Repeater Phase-3 1st April, 2024
33. Repeater for Cellular Network GSM Repeater Phase-3 1st April, 2024
34. Repeater for Cellular Network GSM WCDMA and LTE Phase-3 1st April, 2024
Repeater
35. Repeater for Cellular Network LTE (Long Term Evolution) Repeater Phase-3 1st April, 2024
36. Repeater for Cellular Network WCDMA (Wideband Code Division Multiple Access) and LTE Repeater Phase-3 1st April, 2024
37. Repeater for Cellular Network WCDMA (Wideband Code Division Multiple Access) Repeater Phase-3 1st April, 2024
38. Base Station for Cellular BTS (Base Transceiver Station ) for GSM (Global System for Mobile Communication) Phase-3 1st August, 2024
Network
39. Base Station for Cellular BTS with AAS (Advanced Antenna Systems) Phase-3 1st August, 2024
Network
40. Base Station for Cellular BTS with MSR (Multi-Standard Radio) up to 4G Phase-3 1st August, 2024
Network
41. Base Station for Cellular eNodeB for LTE (Long Term Evolution) Phase-3 1st August, 2024
Network
42. Base Station for Cellular NodeB for WCDMA Phase-3 1st August, 2024
Network
43. Compact Cellular Network BTS CCN Phase-3 1st January, 2024
44. Compact Cellular Network eNodeB CCN Phase-3 1st January, 2024
45. Compact Cellular Network NodeB CCN Phase-3 1st January, 2024
46. IoT (Internet of Things) Gateway IoT Gateway Phase-3 1st January, 2024
47. Tracking Device Asset Tracking Device Phase-3 1st January, 2024
48. Tracking Device Human Tracking Device Phase-3 1st January, 2024
49. Tracking Device Pet Tracking Device Phase-3 1st January, 2024
50. Tracking Device Standalone tracking device for Vehicle Phase-3 1st January, 2024
51. Smart Electricity Meter Smart Electricity Meter Phase-3 1st August, 2024
52. Mobile Radio Trunking System MRTS Base Station – Baseband Phase-4 1st August, 2024
plus Radio
53. Mobile Radio Trunking System MRTS Base Station – Radio Only Phase-4 1st August, 2024
54. Mobile Radio Trunking System MRTS Baseband Equipment Phase-4 1st August, 2024
without Radio
55. Mobile Radio Trunking System MRTS Fixed Station Phase-4 1st August, 2024
56. Mobile Radio Trunking System MRTS Handheld Portable Phase-4 1st August, 2024
Station
57. Mobile Radio Trunking System MRTS Mobile Station Phase-4 1st August, 2024
58. Conferencing Equipment Audio Conference Facility Phase-4 1st January, 2024
Device
59. Conferencing Equipment Multi Line Telephone System Phase-4 1st January, 2024
60. HF (High Frequency) Radio HF Base Station – Baseband plus Phase-4 1st April, 2024
Radio
61. HF (High Frequency) Radio HF Base Station – Radio Only Phase-4 1st April, 2024
62. HF (High Frequency) Radio HF Baseband Equipment without Phase-4 1st April, 2024
Radio
63. HF (High Frequency) Radio HF Fixed Station Phase-4 1st April, 2024
64. HF (High Frequency) Radio HF Handheld Portable Stations Phase-4 1st April, 2024
65. HF (High Frequency) Radio HF Mobile Stations Phase-4 1st April, 2024
66. VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System VHF UHF Base Station – Phase-4 1st August, 2024
Equipment Baseband plus Radio
67. VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System VHF UHF Base Station – Radio Phase-4 1st August, 2024
Equipment Only
68. VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System VHF UHF Baseband Equipment Phase-4 1st August, 2024
Equipment without Radio
69. VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System VHF UHF Fixed Station Phase-4 1st August, 2024
Equipment
70. VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System VHF UHF Handheld Portable Phase-4 1st August, 2024
Equipment Stations
71. VHF( Very High Frequency) UHF (Ultra High Frequency) Radio System VHF UHF Mobile Stations Phase-4 1st August, 2024
Equipment
72. PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed PTP or PMP Full Outdoor Phase-4 1st August, 2024
Radio Systems Microwave Systems
73. PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed PTP or PMP Split MW Indoor Phase-4 1st August, 2024
Radio Systems Unit
74. PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed PTP or PMP Split MW Outdoor Phase-4 1st August, 2024
Radio Systems Unit
75. PTP (Point to Point) PMP (Point to Multi Point) Microwave Fixed PTP/PMP Split M W System Phase-4 1st August, 2024
Radio Systems
76. Media Gateway Line Media Gateway Phase-4 1st January, 2024
77. Media Gateway Media Gateway Phase-4 1st January, 2024
78. Media Gateway Media Gateway for CPE Phase-4 1st January, 2024
79. Signalling Gateway Signalling Gateway Phase-4 1st January, 2024
80. Session Border Controller Session Border Controller Phase-4 1st January, 2024
81. Softswitch Softswitch Phase-4 1st January, 2024
82. DSL(Digital Subscriber Line) Equipments DSLAM Phase-4 1st January, 2024
83. DSL(Digital Subscriber Line) Equipments DSL Modem Phase-4 1st January, 2024
84. Satellite Communication Satellite Amplifier Phase-4 1st August, 2024
Equipment
85. Satellite Communication Satellite Baseband Mod or Phase-4 1st August, 2024
Equipment Demod or Controller
86. Satellite Communication Satellite Baseband Modem Phase-4 1st August, 2024
Equipment
87. Satellite Communication Satellite Baseband Modem Phase-4 1st August, 2024
Equipment Controller
88. Satellite Communication Satellite BUC (Block Up Converter) Phase-4 1st August, 2024
Equipment
89. Satellite Communication Satellite IF Transreceiver Phase-4 1st August, 2024
Equipment
90. Satellite Communication Satellite LNA (Low Noise Amplifier) Phase-4 1st August, 2024
Equipment
91. Satellite Communication Satellite LNB(Low Noise Block downconverter) Phase-4 1st August, 2024
Equipment
92. Satellite Communication Satellite Optimisation Equipment Phase-4 1st August, 2024
Equipment
93. Satellite Communication Satellite Radio Frequency Phase-4 1st August, 2024
Equipment Transceiver
94. Satellite Communication VSAT (Very Small Aperture Terminal) Terminals Phase-4 1st August, 2024
Equipment
95. LAN (Local Area Network) Switch L2 LAN Switch Phase-4 1st August, 2024
96. LAN (Local Area Network) Switch L3 LAN Switch Phase-4 1st August, 2024
97. LAN (Local Area Network) Switch MPLS (Multiprotocol Label Switching) TP (Transport Profile) CEN (Carrier Ethernet Network )Switch Phase-4 1st August, 2024
98. LAN (Local Area Network) Switch L2 Unmanaged Switch Phase-4 1st August, 2024
99. Router BNG (Broadband Network Gateway) or BRAS (Broadband Remote Access Server) Router Phase-4 1st August, 2024
100. Router Cloud Control Capable Router Phase-4 1st August, 2024
101. Router IPV4 (Internet Protocol v4) Router Phase-4 1st August, 2024
102. Router IPV6 (Internet Protocol v6) Router Phase-4 1st August, 2024
103. Router MPLS (Multiprotocol Label Switching) Router Phase-4 1st August, 2024
104. Transmission Terminal DWDM (Dense wavelength-division multiplexing) Equipment Phase-4 1st January, 2024
Equipment-2
105. Transmission Terminal Digital Cross Connect Phase-4 1st January, 2024
Equipment-2
106. IP (Internet Protocol) Security Equipment Firewall Equipment Phase-4 1st August, 2024
107. IP (Internet Protocol) Security Equipment Intrusion Detection System Phase-4 1st August, 2024
Equipment
108. IP (Internet Protocol) Security Equipment Intrusion Prevention System Phase-4 1st August, 2024
Equipment
109. IP (Internet Protocol) Security Equipment Unified Threat Management Phase-4 1st August, 2024
Equipment
110. Precision Timing Protocol Precision Timing Protocol Grand Phase-4 1st January, 2024
Grand Master Equipment Master Equipment
111. Mobile Management Entity MME with connectivity to MSC SGSN Phase-4 1st January, 2024
112. Mobile Management Entity MME for LTE Phase-4 1st January, 2024
113. Cell Broadcast Centre CBC for GSM Phase-4 1st January, 2024
114. Cell Broadcast Centre CBC for LTE or LTE-A Phase-4 1st January, 2024
115. Cell Broadcast Centre CBC For UMTS Phase-4 1st January, 2024
116. IP Multimedia Conferencing IP Multimedia Conferencing Phase-4 1st January, 2024
Equipment Equipment
117. BSC (Base Station Control) RNC (Radio Network Controller) BSC for GSM Phase-4 1st January, 2024
118. BSC (Base Station Control) RNC (Radio Network Controller) RNC for WCDMA Phase-4 1st January, 2024
119. SMLC (Serving Mobile Location Center)or eSMLC (Evolved Serving Mobile Location Center ) eSMLC for LTE Phase-4 1st January, 2024
120. SMLC (Serving Mobile Location Center)or eSMLC (Evolved Serving Mobile Location Center ) SMLC for GSM Phase-4 1st January, 2024
121. SMLC (Serving Mobile Location Center)or eSMLC (Evolved Serving Mobile Location Center ) SMLC for WCDMA Phase-4 1st January, 2024
122. SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) GGSN Phase-4 1st January, 2024
123. SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) SGSN For GSM Phase-4 1st January, 2024
124. SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) SGSN For LTE Phase-4 1st January, 2024
125. SGSN (Serving GPRS Support Node) or GGSN (Gateway GPRS Support Node) SGSN For WCDMA Phase-4 1st January, 2024
126. HLR (Home Location Register) AUC (Authentication Cente) HSS (Home Subscriber Server) HLR or AUC Phase-4 1st January, 2024
127. HLR (Home Location Register) AUC (Authentication Cente) HSS (Home Subscriber Server) HSS Phase-4 1st January, 2024
128. MSC or MSC-S or GMSC or MSC-S or GMSC-S Phase-4 1st January, 2024
GMSC-S including VLR
129. MSC or MSC-S or GMSC or MSC or GMSC including VLR Phase-4 1st January, 2024
GMSC-S including VLR for GSM
130. MSC or MSC-S or GMSC or MSC or GMSC including VLR Phase-4 1st January, 2024
GMSC-S including VLR for WCDMA
131. Infiniband Switch Infiniband Switch Phase-4 1st January, 2024
132. OTA (Over-The-Air) and DM (Device Manager) or FOTA (Firmware Over-The-Air) DM or FOTA Phase-4 1st January, 2024
133. OTA (Over-The-Air) and DM (Device Manager) or FOTA (Firmware Over-The-Air) OTA Phase-4 1st January, 2024
134. SCP (Service Control Point) SCP Phase-4 1st January, 2024
135. OMC(Operations and Maintenance Center) or EMS (Element Management Systems) or NMS (Network Management Systems) or OSS (Operations Support System) NMS Phase-4 1st January, 2024
136. OMC(Operations and Maintenance Center) or EMS (Element Management Systems) or NMS (Network Management Systems) or OSS (Operations Support System) OMC or EMS Phase-4 1st January, 2024
137. S-GW (Serving Gateway) or P-GW (Packet Data Network Gateway) P-Gateway Phase-4 1st January, 2024
138. S-GW (Serving Gateway) or P-GW (Packet Data Network Gateway) S-Gateway Phase-4 1st January, 2024
139. SMSC (Short Message Service Center) SMSC Phase-4 1st January, 2024
140. GMLC (Gateway Mobile Location Centre) GMLC for GSM or WCDMA Phase-4 1st January, 2024
141. GMLC (Gateway Mobile Location Centre) GMLC for LTE or LTE-A Phase-4 1st January, 2024
142. EIR (Equipment Identity Register) EIR for GSM or WCDMA Phase-4 1st January, 2024
143. EIR (Equipment Identity Register) EIR for LTE Phase-4 1st January, 2024
144. Optical Fibre Cable Hybrid Cable – Optical and Phase-4 1st January, 2024
Metallic
145. Optical Fibre Cable Optical Fibre Cable – ADSS on Phase-4 1st January, 2024
Aerial alignment
146. Optical Fibre Cable Optical Fibre Cable – ADSS along Phase-4 1st January, 2024
Power line
147. Optical Fibre Cable Optical Fibre Cable – Direct Phase-4 1st January, 2024
Buried
148. Optical Fibre Cable Optical Fibre Cable – DSA Phase-4 1st January, 2024
149. Optical Fibre Cable Optical Fibre Cable – Duct Phase-4 1st January, 2024
150. Optical Fibre Cable Optical Fibre Cable – In home Phase-4 1st January, 2024
151. Optical Fibre Cable Optical Fibre Cable – Indoor Phase-4 1st January, 2024
152. Optical Fibre Cable Optical Fibre Cable – Indoor/ Phase-4 1st January, 2024
Outdoor
153. Optical Fibre Cable Optical Fibre Cable – Micro-Duct Phase-4 1st January, 2024
154. Optical Fibre Cable Optical Fibre Cable – Access Outdoor Phase-4 1st January, 2024
155. Optical Fibre Cable Optical Groung Wire -OPGW Phase-4 1st January, 2024
156. SIM (Subscriber Identity Module) CSIM (CDMA SIM) Phase-4 1st August, 2024
157. SIM (Subscriber Identity Module) eSIM (Embedded SIM) Phase-4 1st August, 2024
158. SIM (Subscriber Identity Module) eUICC (Embedded Universal Integrated Circuit Card) Phase-4 1st August, 2024
159. SIM (Subscriber Identity Module) RUIM (Removable User Identity Module) Phase-4 1st August, 2024
160. SIM (Subscriber Identity Module) SIM Phase-4 1st August, 2024
161. SIM (Subscriber Identity Module) UICC (Universal Integrated Circuit Card) based ISIM Phase-4 1st August, 2024
162. SIM (Subscriber Identity Module) USIM (Universal Subscriber Identity Module) Phase-4 1st August, 2024
163. Radio Broadcast Receiver RBR All Motor vehicle RBRs Phase-4 1st January, 2024
requiring external power
164. All RBRs driven with inbuilt 1st January, 2024
Radio Broadcast Receiver RBR power source Phase-4
165. Other devices having RBR interface 1st January, 2024
Radio Broadcast Receiver RBR Phase-4
166. Optical Fibre – Single Mode Optical Fibre – G.652.D Phase-4 1st January, 2024
167. Optical Fibre – Single Mode Optical Fibre – G.655 Phase-4 1st January, 2024
168. Optical Fibre – Single Mode Optical Fibre – G.656 Phase-4 1st January, 2024
169. Optical Fibre – Single Mode Optical Fibre – G.657. A1 Phase-4 1st January, 2024
170. Optical Fibre – Single Mode Optical Fibre – G.657. A2 Phase-4 1st January, 2024
171. Optical Fibre – Single Mode Optical Fibre – G.657. B3 Phase-4 1st January, 2024
172. Optical Fibre – Single Mode Optical Fibre -G.654.D Phase-4 1st January, 2024
173. Optical Fibre – Single Mode Optical Fibre -G.654.E Phase-4 1st January, 2024
174. Base station for cellular network for 5G BTS with Multi Standard Radio Phase-5 1st July, 2024
175. Base station for cellular network for 5G Active Antenna System-OTA Phase-5 1st July, 2024
176. Base station for cellular network for 5G Base Station 5G NR Type 1C Phase-5 1st July, 2024
177. Base station for cellular network for 5G Base Station 5G NR Type 1H Phase-5 1st July, 2024
178. Base station for cellular network for 5G Base Station 5G NR Type 1O Phase-5 1st July, 2024
179. Base station for cellular network for 5G Base Station 5G NR Type 2O Phase-5 1st July, 2024
180. Base station for cellular network for 5G Hybrid Active Antenna System Phase-5 1st July, 2024
181. 5G Core AMF (Access and Mobility Management Function ) Phase-5 1st July, 2024
182. 5G Core AuSF (The Authentication Server Function) Phase-5 1st July, 2024
183. 5G Core BSF (Binding Support Function) Phase-5 1st July, 2024
184. 5G Core CHF (Charging Function) Phase-5 1st July, 2024
185. 5G Core NEF (Network Exposure Function) Phase-5 1st July, 2024
186. 5G Core NSSF (Network Slice Selection Function) Phase-5 1st July, 2024
187. 5G Core PCF (Policy Control Function) Phase-5 1st July, 2024
188. 5G Core SMF (Session Management Function) Phase-5 1st July, 2024
189. 5G Core SMSF (Short Message Service Function) Phase-5 1st July, 2024
190. 5G Core UDM (Unified Data Management) Phase-5 1st July, 2024
191. 5G Core UDR (Unified Data Repository) Phase-5 1st July, 2024
192. 5G Core UPF (User Plane Function) Phase-5 1st July, 2024
193. Hypervisor Hypervisor Phase-5 1st July, 2024
194. E-band Fixed Radio Relay System E-Band MW Full Outdoor System Phase-5 1st July, 2024
195. E-band Fixed Radio Relay System E-Band MW Outdoor System plus Indoor System Phase-5 1st July, 2024
196. Converged Multi service Application Access Equipment C-MSAAE Phase-5 1st July, 2024
(C-MSAAE)
197. IP (Internet Protocol)Terminal SIP Terminal Phase-5 1st July, 2024
We are using cookies to give you the best experience. You can find out more about which cookies we are using or switch them off in privacy settings.
AcceptPrivacy Settings

GDPR